Contract – Construction. The Technology and Construction Court answered a preliminary issue in a dispute between a contractor and subcontractor, where a flood had caused damage to a property at which the defendant subcontractor had been working. The court held that the flood had happened after the date of practical completion of the subcontract works. As a result, the claimant contractor was able to maintain a claim against the defendant for its losses.